DreamLine DL-6501L-04CL Instalační příručka

Procházejte online nebo si stáhněte Instalační příručka pro ne DreamLine DL-6501L-04CL. DreamLine DL-6501L-04CL Installation Guide Uživatelská příručka

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 28
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 0
Aqua Shower Door & Base Kit
S
HOWER
Door
AND
S
HOWER
B
ASE
K
IT
I
NSTALLATION
I
NSTRUCTIONS
IMPORTANT
DreamLine
TM
reserves the right to alter, modify or redesign products at any time
without prior notice. For the latest up -to-date technical drawings, manua ls or any
other details please refer to the support.BathAuthority.com web page.
STEP 1: Install Shower Base
Shower Base Installation Instructions
STEP 2: Install Shower Door
Shower Door Installation Instructions
P
lease read these instructions carefully before installing. If you have any questions regarding
installation, please call our technical support specialists Monday through Friday 9:00 AM – 5:00
PM EST at Phone: 1-866-731-2244, Fax: 1-866-227-1533 or e-mail our technical support group
at
support@BathAuthority.com.
For more information on DreamLine
TM
Shower Doors & Tub Doors please visit www.BathAuthority.com
Zobrazit stránku 0
1 2 3 4 5 6 ... 27 28

Shrnutí obsahu

Strany 1 - NSTRUCTIONS

Aqua Shower Door & Base Kit SHOWER Door AND SHOWER BASE KIT INSTALLATION INSTRUCTIONS IMPORTANT DreamLineTM reserves the right to alter

Strany 2 - IMPORTANT

“AQUA” Rev.3 Ver.1 02/2014 9 10. Apply caulk inside and outside along bottom and vertical edge of the stationary glass and wall profile. See Fi

Strany 3 - Tools Required

SLIMLINE SHOWER BASE SHOWER BASE DIMENSIONS AND INSTALLATION INSTRUCTIONS IMPORTANT DreamLineTM reserves the right to alter, modify or redesign

Strany 4 - Packing List

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 2Preparation 1. Examine boxes and packages for shipping damage. Carefully remove Shower base from th

Strany 5 - Shower/Tub Door Installation

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 3SINGLE THRESHOLD SHOWER BASE Center Drain Configuration MODEL SPECIFICATION D (in) W (in)

Strany 6 - Ø1/8"

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 4Left-Hand Drain Configuration MODEL SPECIFICAT

Strany 7

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 5Right-Hand Drain Configuration

Strany 8

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 6NEO SHOWER BASE MODEL SPECIFICATION W (in) A (in) B (in) C (in) DLT-2

Strany 9 - Fig. 10

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 7QUARTER ROUND SHOWER BASE MODEL SPECIFICATION W (in) C (

Strany 10 - Fig. 11

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 8DOUBLE THRESHOLD SHOWER BASE Corner Drain Configuration MODEL SPECIFICATION W (in) C

Strany 11 - SLIMLINE SHOWER BASE

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 9Left-Hand Drain Configuration MODEL SPECIFICATION D (in) W (in) D1 (in) W1 (in)

Strany 12 - Preparation

AQUA SHOWER / TUB DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLineTM reserves the right to alter, modify or redesign products at any time wit

Strany 13 - SINGLE THRESHOLD SHOWER BASE

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 10Right-Hand Drain Configuration MODEL SPECIFICATION D (in) W (in) D1 (in)

Strany 14

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 11Diagram of the Shower Base in a Cross Section Finished Wall Cement board S

Strany 15

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 12Shower Base Installation Preparation 1. Ensure that the floor and the studs are at right angle. Pr

Strany 16 - NEO SHOWER BASE

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 132. Install the shower drain (NOT PROVIDED) according to the drain installation manual (supplied wit

Strany 17 - QUARTER ROUND SHOWER BASE

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 14 4. Level the tray and place marks on the studs above the upper edge of the tile flange. See

Strany 18 - DOUBLE THRESHOLD SHOWER BASE

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 15 6. After the bedding material has been poured and before it sets, place the shower base into the p

Strany 19

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 16 Fig. 9 Product maintenance To insure long lasting life

Strany 20

DREAMLINE™EXCLUSIVELIMITEDWARRANTYASOFMAY6,2013Thiswarrantyextendsonlytotheoriginalowner/end‐userforhouseholduseonlyandisnottr

Strany 21

TEL: 866-731-2244 FAX: 866-227-1533 WWW.BATHAUTHORITY.COM For more information on DreamLineTM Shower Doors please visit www.Bath

Strany 22

“AQUA” Rev.3 Ver.1 02/2014 2 Preparation 1. After opening all boxes and packages, read this introduction carefully. Check that all of the need

Strany 23

“AQUA” Rev.3 Ver.1 02/2014 3Detailed Diagram of Shower Door and Tub Door Component 456738910111214121315 Packing List 01 Wall profile 1pc 0

Strany 24

“AQUA” Rev.3 Ver.1 02/2014 4Shower/Tub Door Installation 1. Place the Wall profile (01) to the wall above the shower base or tub and level it v

Strany 25

“AQUA” Rev.3 Ver.1 02/2014 5 3. Slide the Stationary glass (02) into the groove of the Wall profile (01). See Fig. 3 for details

Strany 26 - Product maintenance

“AQUA” Rev.3 Ver.1 02/2014 6 5. Place the Stationary glass (02) back into the Wall profile (01) and assemble the Bottom bracket (14). See

Strany 27 - WARRANTYSERVICE

“AQUA” Rev.3 Ver.1 02/2014 7 7. Install both Hinges (04) on the Stationary glass (02) with the decorative non-screw side facing outwards. Hang t

Strany 28 - BATHAUTHORITY.COM

“AQUA” Rev.3 Ver.1 02/2014 8 8. Install the Towel bar (06) onto the Glass door (05). Attach the Anti-water strip (11) over the vertical edge of

Komentáře k této Příručce

Žádné komentáře