DreamLine DL-6129C-01CL Instalační příručka Strana 1

Procházejte online nebo si stáhněte Instalační příručka pro ne DreamLine DL-6129C-01CL. DreamLine DL-6129C-01CL Installation Guide Uživatelská příručka

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 52
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 0
Butterfly Shower Door, Base & Backwall Kit
SHOWER Door, SHOWER BASE AND BACKWALLS KIT INSTALLATION
INSTRUCTIONS
IMPORTANT
DreamLine
TM
reserves the right to alter, modify or redesign products at any time
without prior notice. For the latest up-to-date technical drawings, manuals or any
other details please refer to the support.BathAuthority.com web page.
STEP 1: Install Shower Base
Shower Base Installation Instructions
STEP 2: Install Shower Backwalls
Shower Backwalls Installation Instructions
STEP 3: Install Shower Door
Shower Door Installation Instructions
Please read these instructions carefully before installing. If you have any questions regarding
installation, please call our technical support specialists Monday through Friday 9:00 AM 5:00
PM EST at Phone: 1-866-731-2244, Fax: 1-866-227-1533 or e-mail our technical support
group at
For more information on DreamLine Shower Kit please visit www.BathAuthority.com
Zobrazit stránku 0
1 2 3 4 5 6 ... 51 52

Shrnutí obsahu

Strany 1 - INSTRUCTIONS

Butterfly Shower Door, Base & Backwall Kit SHOWER Door, SHOWER BASE AND BACKWALLS KIT INSTALLATION INSTRUCTIONS IMPORTANT DreamLineTM reserv

Strany 2 - BUTTERFLY

Fig. 11 9. Secure the Roller stoppers (16) inside the top and the bottom Guide rails (03) with the Round head screw ST4.2×1

Strany 3

10. Install the Shower base according to the Shower base installation manual See Fig. 13 for details. Fig. 13 11. Locate the W

Strany 4

12. Push the Wall profiles (01) over the Glass profiles (02) on both sides. Be sure to keep the flange with predrilled holes inside the shower. See

Strany 5 - Shower Door Assembly

14. Outline the Wall profiles (01) from inside of the Shower. Move the Glass unit aside. Remove the Wall profiles from the Glass unit and place them

Strany 6 - Rev 1.1

16. Fold the Glass door, and adjust the bolts on the Rollers (12) to make the door slide smoothly. See fig. 19 for details. Fig.

Strany 7

18. Apply the silicone along the Wall profiles (01), as well as along the Guide rail (03). See Fig. 21 for details. NOTICE: Any adjustment to ma

Strany 8

Ver. 1, Rev. 1 QWALL – 5.1 (1 Back Panel) SHOWER ACRYLIC WALL INSTALLATION INSTRUCTIONS IMPORTANT DreamLineTM reserves the right to alter, modify o

Strany 9

Ver. 1, Rev. 1 2 Preparation 1. After opening all boxes and packages, read this introduction carefully. Check that all of the needed parts are inc

Strany 10 - Fig. 12

Ver. 1, Rev. 1 3Detailed Diagram of Acrylic Shower Wall Components 56784219334" - 38"30" - 34" Packing List 01 Side panel 2pc

Strany 11 - Fig. 14

Ver. 1, Rev. 1 4Preparation for Installation of Back Panel 1. Place a mark on the walls at a distance of 1” (one inch) from the corner and draw a p

Strany 12 - Fig. 16

BUTTERFLY SHOWER DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLineTM reserves the right to alter, modify or redesign products at any time with

Strany 13 - Fig. 18

Ver. 1, Rev. 1 5 3. The Back Panel (09) has 3-1/8” flange on both sides and has to be cut equally from both sides if necessary. See Fig. 3 for deta

Strany 14 - Fig. 20

Ver. 1, Rev. 1 6 5. Mark the measurement “W” on the Back Panel (09) and draw straight lines from top to bottom. NOTE: The Back Panel has to be trim

Strany 15 - Product Maintenance

Ver. 1, Rev. 1 7 Fig. 7 Preparation for Installation of Side Panels ATTENTION: See Fig. 8 for details.

Strany 16 - 5.1 (1 Back Panel)

Ver. 1, Rev. 1 8 7. Measure the side walls of the shower from the 1” (one inch) line in the corner (from Step. 1) to the distance where you want Sid

Strany 17 - Tools Required

Ver. 1, Rev. 1 9 9. Place the Side panel (01) on a flat piece of plywood or particle board. Use a sharp industrial knife and a T-square to score alon

Strany 18 - Packing List

Ver. 1, Rev. 1 10 10. Take exact measurements of the fixture on the wall: • from the 1” (one inch) line in the corner of the shower to the fixture:

Strany 19 - Ver. 1, Rev. 1

Ver. 1, Rev. 1 11 12. Drill the holes for the fixtures in the Side panel (01) using the proper diameter saw bit or a handheld jig saw. See Fig. 15 f

Strany 20

Ver. 1, Rev. 1 12 Fig. 17 ATTENTION: 14. Apply the sealant to the entire surface of the reverse side of the Back panel

Strany 21 - Fig. 5

Ver. 1, Rev. 1 13 15. Attach the Back Panel (09) to the center of the back wall with the equal distance between two lines. See Fig. 19 for details.

Strany 22

Ver. 1, Rev. 1 14 17. Apply the sealant to the entire surface of the reverse side of the Side panel (01). Also, apply the sealant around the drilled h

Strany 23 - Fig. 10

Preparation 1. After opening all boxes and packages, read this introduction carefully. Check that all of the needed parts are included in the packa

Strany 24

Ver. 1, Rev. 1 15 19. Apply sealant to the entire surface of the reverse side of the other Side panel (01). See Fig. 21 for details. 20. Slide the

Strany 25

Ver. 1, Rev. 1 16 ATTENTION; Prior to the next step, please be sure the part of the wall for installation of the Decorative edge molding (03) is clea

Strany 26

Ver. 1, Rev. 1 17Glass Shelves Installation Instruction 24. Determine the desired height for the Glass shelves (05) and mark the locations on the wa

Strany 27

Ver. 1, Rev. 1 18 26. Mount the Shelf brackets (04) to the wall using the Countersunk screws ST4.2×30 (07). NOTE: the padded set screw of the Glass b

Strany 28

Ver. 1, Rev. 1 19 Product maintenance To insure long lasting life for your acrylic back walls, wipe them off after each use with a soft cloth. To

Strany 29 - Fig. 22

SLIMLINE SHOWER BASE SHOWER BASE DIMENSIONS AND INSTALLATION INSTRUCTIONS IMPORTANT DreamLineTM reserves the right to alter, modify or redesign

Strany 30 - Fig. 24

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 2Preparation 1. Examine boxes and packages for shipping damage. Carefully remove Shower base from th

Strany 31 - Fig. 26

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 3SINGLE THRESHOLD SHOWER BASE Center Drain Configuration MODEL SPECIFICATION D (in) W (in)

Strany 32 - Fig. 28

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 4Left-Hand Drain Configuration MODEL SPECIFICAT

Strany 33 - Fig. 30

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 5Right-Hand Drain Configuration

Strany 34 - TABLE OF CONTENTS

Detailed Diagram of Shower Door Components 1234567891011121314151617BA1812 Packing List 01 Wall profile 2pcs 10 Decorative cover 4pcs 02 Gla

Strany 35 - SLIMLINE SHOWER BASE

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 6NEO SHOWER BASE MODEL SPECIFICATION W (in) A (in) B (in) C (in) DLT-2

Strany 36 - Preparation

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 7QUARTER ROUND SHOWER BASE MODEL SPECIFICATION W (in) C (

Strany 37 - SINGLE THRESHOLD SHOWER BASE

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 8DOUBLE THRESHOLD SHOWER BASE Corner Drain Configuration MODEL SPECIFICATION W (in) C

Strany 38

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 9Left-Hand Drain Configuration MODEL SPECIFICATION D (in) W (in) D1 (in) W1 (in)

Strany 39

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 10Right-Hand Drain Configuration MODEL SPECIFICATION D (in) W (in) D1 (in)

Strany 40 - NEO SHOWER BASE

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 11Diagram of the Shower Base in a Cross Section Finished Wall Cement board S

Strany 41 - QUARTER ROUND SHOWER BASE

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 12Shower Base Installation Preparation 1. Ensure that the floor and the studs are at right angle. Pr

Strany 42 - DOUBLE THRESHOLD SHOWER BASE

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 132. Install the shower drain (NOT PROVIDED) according to the drain installation manual (supplied wit

Strany 43

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 14 4. Level the tray and place marks on the studs above the upper edge of the tile flange. See

Strany 44

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 15 6. After the bedding material has been poured and before it sets, place the shower base into the p

Strany 45

Shower Door Assembly NOTICE: The installation presented here is for the left door opening. For the right door opening, you will need to rotate the

Strany 46

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 16 Fig. 9 Product maintenance To insure long lasting life

Strany 47

DREAMLINE™EXCLUSIVELIMITEDWARRANTYASOFMAY6,2013Thiswarrantyextendsonlytotheoriginalowner/end‐userforhouseholduseonlyandisnottr

Strany 48

TEL: 866-731-2244 FAX: 866-227-1533 WWW.BATHAUTHORITY.COM For more information on DreamLineTM Shower Doors please visit www.Bath

Strany 49

B3. Attach the top and the bottom Rollers (12) to the right edge of the Glass Door B (05). Mind the position of the rollers on the glass. See Fig.

Strany 50

Fig. 5 5. Locate the Guide rails (03) and the Glass profile (02). Connect the left end of the Guide rails to the Glass pro

Strany 51 - WARRANTYSERVICE

6. Slide the glass unit into the channel of the Guide rails (03) from the right side. See Fig. 7 and Fig. 8 for details. F

Strany 52 - BATHAUTHORITY.COM

7. Secure the Hinges (13) inside the Guide rails (03) using the Round head screws ST4.2×12 (08). See Fig. 9 for details. Fig.

Komentáře k této Příručce

Žádné komentáře